(From Left to Right) We are very proud of all of the hands making our project
happen. The sign was designed by Butternut Graphics.
Roger Heroux of Heroux Excavating installed silt fences to protect
the wetlands, built the temporary construction road, and excavated
the foundation. Roger also had to strip mountains of topsoil,
reserving them for future landscaping. William Fuller built
the forms for the concrete pouring of the all important footers. |
(From Left to Right) The pumper truck arrives, and concrete flows.
Once the pour is finished, William and his crew blanket
and insulate the footers, covering them carefully. The rebar
is in place for the foundation pour. |
(From Left to Right) The forms for the foundation are in place.
The concrete truck and pumper truck arrive. The foundation is
uncovered, and W.B. Construction begins framing. |
Floor Joists Are Being Placed |
|
|
|
Above-From trusses, to
shingles, to our architectural shingles with copper valleys, and a
sea of septic tanks. Below-electric service is in, the
mahogony doors from Brazil have arrived, and the chimneys
are on. |
|
|