Portabello's Banquet & Conference Center
 
Home
Celebrations
Corporate Functions
Catering Photo Gallery
Map
Menu Options
Bar Packages
Construction Photos
Contact Us

Construction


(From Left to Right)

We are very proud of all of the hands making our project happen.  The sign was designed by Butternut Graphics.  Roger Heroux of Heroux Excavating installed silt fences to protect the wetlands, built the temporary construction road, and excavated the foundation.  Roger also had to strip mountains of topsoil, reserving them for future landscaping.  William Fuller built the forms for the concrete pouring of the all important footers.



(From Left to Right)

The pumper truck arrives, and concrete flows.  Once the pour is finished, William and his crew blanket and insulate the footers, covering them carefully.  The rebar is in place for the foundation pour.



(From Left to Right)

The forms for the foundation are in place.  The concrete truck and pumper truck arrive.  The foundation is uncovered, and W.B. Construction begins framing. 



Floor Joists Are Being Placed



Above-From trusses, to shingles, to our architectural shingles with copper valleys, and a sea of septic tanks.  Below-electric service is in, the mahogony doors from Brazil have arrived, and the chimneys are on.